DEVELOPMENT OF NEW TERMIAL, CONCORSE AND MUCH MORE AT DUBAI AIRPORT.

Construction work for Terminal 3, concourse 2 and concourse 3 is scheduled for completion by 2006
Cost: $2.5 billion
Up to: 60 million passengers a year

CONCOURSE 2
Directly connected to Terminal 3, Concourse 2 is dedicated exclusively to Emirates. The building will include a multi-level structure for departures and arrivals at Dubai Airport incorporating 27 contact gates and 59 passenger-loading bridges. Additionally, there will be a direct connection to Sheikh Rashid Terminal located at the control tower structure. There is also a 300-room hotel and health club that will include both five and three star rooms. A further 10,000m² of commercial space will be home to Dubai Duty Free and restaurants. Concourse 2 will include five aerobridges capable of handling the new Airbus A380 Super Jumbo. The two concourse buildings will be linked via this airbus, enabling transiting passengers to move freely between the two buildings.

avatar



Comments
 
Who Zoomed
 
Related Links